From 9:00 PM to 4:00 AM PDT on weekdays and Sunday. Starting Sun Oct 29 at 9:00 PM PDT until Fri Nov 3 at 4:00 AM PDT. Bridge maintenance planned between Port Mann Bridge and Port Mann Bridge (Surrey). Highway 1 (TransCanada Highway), eastbound. From 9:00 AM to 11:00 AM PDT on Monday and Tuesday. Road maintenance work planned between Exit 19: Lynn Valley Rd and Exit 21: Mountain Hwy for 2.0 km (North Vancouver - District to North Vancouver - City). Bridge maintenance at Exit 4: Headland Dr (West Vancouver). Bridge maintenance between Exit 2: Eagleridge Dr and Exit 3 for 0.7 km (West Vancouver). Estimated time of re-opening Fri Oct 20 at 5:00 AM PDT. Southbound left lane for northbound traffic. Utility work between Campbell St and Dawes St for 0.3 km (Nanaimo). Highway 1 (TransCanada Highway), in both directions. Construction work between Crace St and Nicol St for 0.1 km (Nanaimo). Highway 1 (TransCanada Highway), northbound. Right southbound lane of Highway 1 closed between Grouhel Rd and Buller St due to Ladysmith and Royal Canadian Legion Remembrance Day Ceremony. Starting Sat Nov 11 at 10:00 AM PDT until Sat Nov 11 at 1:00 PM PDT. Special event planned between Grouhel Rd and Buller St for 0.6 km (Ladysmith). Highway 1 (TransCanada Highway), southbound. Right northbound lane of Highway 1 closed near Panorama Ridge Road due to BC Hydro construction work. Starting Wed Nov 1 at 10:00 AM PDT until Wed Nov 1 at 3:00 PM PDT. Utility work planned between River Rd and Radford Rd for 0.7 km (Chemainus). One bridge will be closed for repairs with all traffic diverted onto the adjacent bridge. Lane closures in both directions in effect. Bridge maintenance between Mt Sicker Rd and Fuller Lake Rd for 3.7 km (Chemainus). Highway 1 (on Vancouver Island), in both directions. Single lane alternating traffic overnight starting September 11th (9PM to 5AM). Vehicle Width Permit over 3.8 meters may be available (Commercial Transport Notice #05-21, Amended: 13JULY22]. Minor delays up to 20 min outside peak travel. Construction work between Finlayson Arm Rd and Wellswood Rd for 4.3 km (Goldstream Provincial Park to 1 km north of Langford). Next update time Wed Nov 1 at 12:00 PM MDT. Route is available via Hwy 95 and Hwy 93S. Delays of 30 min expected 9AM-3PM and 8PM-10PM MDT daily. Construction work between Golden Donald Upper Rd and Yoho Bridge for 5.2 km (2 to 7 km east of Golden). Next update time Mon Oct 30 at 12:00 PM PDT. Periodic single lane alternating traffic and highway stoppages. Bridge construction at Nicomen River Rd (14 km east of Lytton). Next update time Wed Nov 1 at 4:30 PM PDT. Piloted-Single Lane alternating traffic 24/7 for 8km section. Bridge construction at Jackass Summit (2 km north of Jackass Mountain Summit). Next update time Sun Dec 31 at 11:45 AM PDT. Motorists should obey construction signage and TCPs. Inside lanes closed for Nanaimo Utility rehabilitation project. From 12:00 AM to 11:45 PM PDT on weekdays. Utility work between Crace St and Bastion St for 0.6 km (Nanaimo).
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |